MEP, Fire Sprinkler, Solar Design & T24 Design   Sacramento, CA 

MEP, Fire Sprinkler, Solar Design & T24 Design   Sacramento, CA 

We’re about to kick off our new project at 245 Eleanor Avenue, Sacramento, CA, where we are providing comprehensive MEP, Fire Protection, Solar Design, and T24 Compliance.

Future Expansion Consideration:

This project is designed with future growth in mind. We have strategically planned all systems to accommodate a future second story, ensuring scalability for plumbing, electrical, and HVAC systems. Additionally, the electrical design is tailored to support the addition of a future elevator in the front entry alcove, positioned next to the front door, providing long-term functionality for the property.

Scope of Work: 

Mechanical Design: 

  • HVAC load calculations, duct layouts, roof plans 
  • Designed to support a future second story with scalable ductwork for future needs 

Electrical Design:

  • Full lighting, power, and panel schedule design 
  • Designed to accommodate the addition of a future elevator in the front entry alcove 
  • Scalable electrical infrastructure to support a second story expansion 

Plumbing Design:

  • Plumbing systems including domestic water, drainage, and rainwater design 
  • Domestic water and sanitary 2D riser diagrams 
  • Scalable plumbing infrastructure for future second story and expansion needs 

Fire Protection:

  • NFPA 13-compliant fire sprinkler plans and zoning, adaptable to future expansion 

Solar Design:

  • Custom solar design with panel layouts integrated into the existing structure 
  • Panel locations adjusted for current design and future expansion 

Integrated Approach:

Our team ensures that all systems are not only efficient and compliant with codes but also adaptable to future expansions, ensuring the building’s long-term functionality and growth. 

Unlock the potential of your projects with S3DA’s expertise.

×