
{"id":517,"date":"2020-05-25T21:44:19","date_gmt":"2020-05-25T21:44:19","guid":{"rendered":"http:\/\/65.21.7.236\/s3da-design\/2020\/05\/25\/12-steps-toward-a-successful-commercial-construction-process\/"},"modified":"2020-05-25T21:44:19","modified_gmt":"2020-05-25T21:44:19","slug":"12-steps-toward-a-successful-commercial-construction-process","status":"publish","type":"post","link":"http:\/\/65.21.7.236\/s3da-design\/12-steps-toward-a-successful-commercial-construction-process\/","title":{"rendered":"12 Steps Toward a Successful Commercial Construction Process"},"content":{"rendered":"<p>Have you found yourself immersed in a confusing landscape of codes and permits, of construction schematics and environmental analyses?\u00a0 The planning and construction of a commercial building may seem like a daunting process, but it doesn\u2019t have to be if you familiarize yourself with the basic steps and look for a reputable, experienced design firm to guide you along the way.<\/p>\n<h3><strong>Initial Preparation<\/strong><\/h3>\n<p>You will probably want to begin your process by researching commercial design firms and setting up interviews to ensure you have a good match.\u00a0 This is also a good time to either begin your search for general contractors or to discuss with the design firm you chose about their process for selecting contractors.<\/p>\n<p>After you\u2019ve chosen a design firm, you will want to discuss options such as whether to <a href=\"https:\/\/www.tallboxdesign.com\/how-to-find-the-best-custom-home-building-company\/\" target=\"_blank\" rel=\"noopener\">renovate an existing structure or to build from the ground up<\/a>.\u00a0 Your firm will want to discuss with you various remodel possibilities.\u00a0 This is also the time to negotiate each party\u2019s responsibilities, the project milestones and expected results, the legal obligations for each party, and to hammer out a work plan.<\/p>\n<h3><strong>Research, Surveys, and Sketches<\/strong><\/h3>\n<p>Your chosen design firm should immediately begin the research process into zoning maps, property liens, past permits on file, parcel data, and other pertinent information. They should also start gathering requirements pertaining to pre-permit and permit submission requirements.<\/p>\n<p>If you are working with an existing structure, your design firm should produce documents providing all specifications on the structure as is.\u00a0 Don\u2019t hesitate to provide your own sketches, photos, or examples to your designers to indicate the visions you have for the project.<\/p>\n<p>Where necessary, this would also be the stage to conduct site surveys and to hold discussions with feasibility consultants and environmental specialists who can confirm the viability of your projected designs.<\/p>\n<h3><strong>Coordination and Interpretation<\/strong><\/h3>\n<p>You should be sure by this point in the process that you have designated an internal project coordinator who will be your point of contact with the design firm.\u00a0 The designee should schedule a meeting, following the research phase, to hash out understanding of the codes, permits, and timelines; to hold a Q and A about their impact, and to come to an agreement on translating codes into a physical design that meets your project goals.<\/p>\n<h3><strong>Initial Diagram<\/strong><\/h3>\n<p>The first element of the actual design process will be a diagram that considers codes in a visual format.\u00a0 It will consider \u201clarge picture\u201d requirements, such as proximity to other buildings, height restrictions, and egress requirements.<\/p>\n<h3><strong>Design Details and Full Feasibility Study<\/strong><\/h3>\n<p>A full feasibility study of the large-scale design should be conducted at this point to understand how access to the site, the orientation of the building, availability of existing utilities, and other factors influence and limit design.<\/p>\n<p>Your design firm will discuss with you how feasibility limitations alter the schematic design and may provide various alternatives to the initial proposal.\u00a0 They can then begin to diagram a more detailed schematic that incorporates lifestyle components, such as <a href=\"https:\/\/abbyirondoors.com\/why-a-custom-iron-door-is-a-smart-investment\/\">door<\/a> and window choices, natural lighting, common areas, and public and private spaces.<\/p>\n<p>You will also want to spend time at this phase discussing your target budget, analyzing projected construction costs, and making adjustments based on priorities.<\/p>\n<h3><strong>Predicting Impediments<\/strong><\/h3>\n<p>You and your design firm should meet to understand the pre-submission requirements for some permits, such as special easements or covenants.\u00a0 Discovering and dealing with such impediments early in the process will clear the path to permit and avoid unnecessary time delays.<\/p>\n<h3><strong>Incorporation of Permits into Design<\/strong><\/h3>\n<p>A full understanding of the permitting process will lead to the most detailed version of design plans to date that incorporates the restrictions of permits into the design process.\u00a0 At this stage, you can expect to begin making more intricate design decisions, such as whether to use wrought iron exterior doors or where to incorporate tile and wood flooring.<\/p>\n<p>You can expect to review and finalize material palettes, and, should the scale of the project calls for it, to consult with mechanical, <a href=\"https:\/\/s3da-design.com\/structural-engineering-services-california-us\/\">structural<\/a>, and civil engineers so as to incorporate their recommendations.<\/p>\n<h3><strong>Permit Submission Process<\/strong><\/h3>\n<p>The time has come to write your checks for permit fees, to fill out all forms, and to submit to the proper departments.\u00a0 It will probably take the agencies several weeks to review the documentation at which point they will submit corrections and ask for clarifications.\u00a0 Once your design firm has revised design plans based on agency recommendations and the agency has approved the final design, your permits will be issued.<\/p>\n<h3><strong>Construction Design<\/strong><\/h3>\n<p>What has been essentially architectural designs are now translated into a series of detailed construction schematics (in some instances this may already have been required as part of the permitting process).\u00a0 These schematics will take into consideration all design details from the door and window operating function, to light fixtures and appliances and will incorporate the recommendations of suppliers and manufacturers.<\/p>\n<h3><strong>Choosing a General Contractor and Construction Administrator<\/strong><\/h3>\n<p>Now is the time to compare construction estimates and interview general contractors.\u00a0 You should consider their track records on previous contracts, contact referrals, compare pricing, and evaluate how their personality meshes with yours.<\/p>\n<p>Once you have hired a contractor, you will probably also keep the architect on retainer to assure that the integrity of the design plan is maintained.\u00a0 Finally, you will want to hire or appoint a <a href=\"https:\/\/s3da-design.com\/difference-between-construction-manager-general-contractor\/\">construction manager<\/a> to keep the project on schedule and inside the budget.\u00a0 This can be (and often is) the design firm you have worked within the process.<\/p>\n<h3><strong>Construction<\/strong><\/h3>\n<p>The construction manager will coordinate the purchase of all construction materials, equipment, and the necessary labor for the project at which point the building will begin.\u00a0 The process usually starts with grading, excavation, or site conditioning followed by concrete pouring and steel structure erection.\u00a0 From there, framing, roofing, interior, and exterior development will be monitored by the construction manager and individual inspectors for quality control.<\/p>\n<h3><strong>Post Construction<\/strong><\/h3>\n<p>The project will reach an informal conclusion, at which point analysis will be performed to create a \u201cpunch list\u201d of needed revisions to meet specifications and to prepare the building for occupancy.\u00a0 The final step is for the architect to issue a certificate of completion and for a building representative to conduct a final inspection of the premises.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Have you found yourself immersed in a confusing landscape of codes and permits, of construction schematics and environmental analyses?\u00a0 The planning and construction of a commercial building may seem like [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":518,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"footnotes":""},"categories":[35,24,18],"tags":[],"class_list":["post-517","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-our-blog","category-structural-design","category-us"],"acf":[],"_links":{"self":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/posts\/517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/comments?post=517"}],"version-history":[{"count":0,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/posts\/517\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media\/518"}],"wp:attachment":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media?parent=517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/categories?post=517"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/tags?post=517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}