
{"id":1785,"date":"2022-02-25T15:49:08","date_gmt":"2022-02-25T15:49:08","guid":{"rendered":"http:\/\/65.21.7.236\/s3da-design\/2022\/02\/25\/6-41\/"},"modified":"2022-02-25T15:49:08","modified_gmt":"2022-02-25T15:49:08","slug":"6-41","status":"publish","type":"post","link":"http:\/\/65.21.7.236\/s3da-design\/6-41\/","title":{"rendered":"Homeowners: Here\u2019s What May Be Causing Your Project Delay"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Even if you spend months planning for your home remodeling project and have worked out the fine details well in advance, delays can still happen. <\/span><span style=\"font-weight: 400;\">Permitting, unforeseen problems with the house, weather conditions, supply chain issues, and equipment failures are just some of the typical reasons for delays, any of which can lead to increasing aggravation for both you and your contractor. Delays can cause setbacks for homeowners in their project calendar for completing their projects, as well as force them to incur additional expenses.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, sometimes delays are simply unavoidable. If you&#8217;re one of the homeowners with a <a href=\"https:\/\/s3da-design.com\/how-to-plan-a-successful-home-renovation\/\">home renovation<\/a> underway, here are several delays that could be holding up your project.<\/span><\/p>\n<h2><b>Permitting and Inspections<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Nearly any <a href=\"https:\/\/s3da-design.com\/why-home-remodeling-projects-have-boomed-in-ca\/\">remodeling project<\/a> at your home will require you to obtain permits from your city&#8217;s building department. You probably will need more than one permit, too.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For many homeowners, waiting for permits and inspections to come through can be frustrating. However, they&#8217;re necessary and aim to ensure your <\/span><a href=\"https:\/\/www.familyhandyman.com\/article\/how-to-get-a-building-permit\/\"><span style=\"font-weight: 400;\">house meets stringent safety standards<\/span><\/a><span style=\"font-weight: 400;\">, such as electrical, plumbing, and foundational.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Potential buyers will expect to see pulled permits for the completed remodeling work if you try to sell your home. Unpermitted work on your house puts you at risk of devaluing your home. In some cases, you may face having to <\/span><a href=\"https:\/\/www.realtor.com\/advice\/buy\/im-buying-a-home-with-work-done-without-a-permit-what-is-my-responsibility\/\"><span style=\"font-weight: 400;\">pay a fine or undo the work<\/span><\/a><span style=\"font-weight: 400;\"> and seek proper permitting.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Usually, permits can take weeks or even months to obtain, depending on the type of project you&#8217;re doing and how large it is. In some cities, you may also require an inspection, especially if you have an older home.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It&#8217;s possible you could luck out with shortening the permitting process if you hire a reputable contractor. Occasionally, building departments will fast-track project permits if a design is submitted by a professional with a history of compliant construction.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, it would be best not to cut corners regarding permits and inspections. You should also avoid hiring any contractor willing to do the work without them, which raises many red flags.<\/span><\/p>\n<h2><b>Pre-Existing House Conditions<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Throughout any home renovation, there is the potential risk of unforeseen problems with the house. Typically found during demolition, your contractor could inform you of the following issues:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Significant water damage<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Pests and termite damage<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Harmful mold<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Cracks in the foundation<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Asbestos<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Deteriorating roof<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Outdated plumbing or electrical<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Old mechanical equipment such as AC units, furnaces, and water heaters<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The U.S. Environmental Protection Agency (EPA) warns that many <\/span><a href=\"https:\/\/www.epa.gov\/lead\/protect-your-family-sources-lead\"><span style=\"font-weight: 400;\">homes built before 1978<\/span><\/a><span style=\"font-weight: 400;\"> have lead-based paint that is hazardous and requires safe removal. Your contractor may find lead-based paint under fresh coats on walls, doors, windowsills, and railings.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">While these problems could further tighten your budget and cause delays, it&#8217;s a good idea to address them right away before continuing with your scheduled remodeling project.<\/span><\/p>\n<h2><b>Equipment Malfunctions<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Even with the best preventive measures, <\/span><a href=\"https:\/\/www.chicagoindustrial.com\/scissor-life-preventative-maintenance\/\"><span style=\"font-weight: 400;\">equipment malfunctions or failures<\/span><\/a><span style=\"font-weight: 400;\"> are inevitable and could create setbacks in the project timeline.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Sometimes, workers may overload their equipment with materials, leading to breakdowns. Other times, equipment operations may be misused altogether. According to one study, here are a few common <\/span><a href=\"https:\/\/www.researchtrend.net\/ijet\/pdf\/Review%20on%20Delay%20Factors%20due%20to%20Improper%20Construction%20Equipment%20Management%20B.pdf\"><span style=\"font-weight: 400;\">reasons for equipment-related project delays<\/span><\/a><span style=\"font-weight: 400;\">:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Shortage of advanced or appropriate equipment<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Breakdown of machinery<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Improper maintenance<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Low-efficiency equipment<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Poorly trained machinery operators<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">High costs of equipment<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Although these types of delays are out of the hands of homeowners, rest assured that a good contractor will inspect their equipment regularly before daily shifts. They&#8217;ll also ensure their team is fully trained to use the equipment correctly.<\/span><\/p>\n<h2><b>Supply Chain Delays<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">According to the National Association of Home Builders (NAHB), <\/span><a href=\"https:\/\/nahbnow.com\/2021\/06\/record-number-of-builders-report-material-shortages\/\"><span style=\"font-weight: 400;\">90% of builders reported shortages<\/span><\/a><span style=\"font-weight: 400;\"> of materials in 2021, including plywood, windows, doors, and wiring. This record number of shortages is <\/span><a href=\"https:\/\/www.agc.org\/news\/2021\/09\/02\/construction-workforce-shortages-reach-pre-pandemic-levels-even-coronavirus\"><span style=\"font-weight: 400;\">attributed to the ongoing coronavirus pandemic<\/span><\/a><span style=\"font-weight: 400;\">, which has negatively impacted hiring qualified laborers and driven rising material costs.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The supply chain disruptions have also trickled down to the shipping and manufacturing of custom design finishes and fixtures, such as tiles, appliances, lighting, cabinetry, countertops, and flooring.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If your remodeling project incorporates custom or special-order finishes, you will probably have a wait ahead of you.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It&#8217;s important to remember that certain design elements need installation in a particular order, too. Any supply chain delay could cause your contractor to hit the pause button on your project several times throughout the process.<\/span><\/p>\n<h2><b>Change Orders<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">You&#8217;ll want to know how much your remodeling project will cost you from the beginning, which is why it&#8217;s a good idea to negotiate a fixed-price contract for your renovation. Of course, any changes you make to your design will likely yield higher costs.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">When you decide to modify the construction, your contractor will write up a change order reflecting the price differences. You\u2019ll then need to sign the order to verify you agree to pay the difference.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">While a change order is simple enough, it could set the schedule back due to having to order new materials and the labor involved in installing them. Try to clear away all the design decisions before construction to prevent change order delays.<\/span><\/p>\n<h2><b>Weather Delays<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Depending on where you live, weather can slow the construction process down. Unfortunately, it also tends to be out of everyone&#8217;s control. For example, if the work on the exterior of your home is over, a rainy day could set the project back until the skies clear up.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Exterior renovations or house projects may be best suited for dryer, warmer months when your contractor and the construction team can work faster to complete the project.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If interior work also needs to be done, your contractor should look ahead at the forecast and move the work inside if unsuitable weather conditions are expected.<\/span><\/p>\n<h2><b>Miscommunication<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">One of the main reasons for renovation delays \u2013 and a usually avoidable one \u2013 is miscommunication. Several people will be working on your project simultaneously, making it essential for everyone to stay on track.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">When something faces delay, the entire process could potentially slow down. For example, if the flooring materials&#8217; order was too late causing a delay in their arrival, the subcontractor laying them may need to move onto another project in the meantime. Then, your project will have to be rescheduled, setting everyone else back.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Communication, from scheduling to organization, is essential throughout a remodeling project. Choose a contractor who can present a formal timeline for ensuring project completion promptly. Make sure everyone \u2013 you, your contractor, and anyone else involved in the project \u2013 maintain excellent communication at all times.<\/span><\/p>\n<h2><b>Prevent Delays During Your Home Renovation<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Preparation is key to preventing delays during your home remodeling project. Have your design plan ready to go, including having your samples picked out and ordered well in advance. Also, be sure to hire a reputable contractor or renovation company to avoid any setbacks in your project timeline.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>In case you have any architectural, structural, and <a href=\"https:\/\/s3da-design.com\/what-is-mep-engineering\/\">MEP design<\/a> including fire sprinkler design requirements, or need your home renovation design including structure, and HVAC design, feel free to <a href=\"https:\/\/s3da-design.com\/contact\/\">contact us<\/a>.\u00a0 We provide you with the full permit set design + T24 for your request.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Even if you spend months planning for your home remodeling project and have worked out the fine details well in advance, delays can still happen. Permitting, unforeseen problems with [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1786,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1785","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/posts\/1785","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/comments?post=1785"}],"version-history":[{"count":0,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/posts\/1785\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media\/1786"}],"wp:attachment":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media?parent=1785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/categories?post=1785"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/tags?post=1785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}