
{"id":9372,"date":"2026-05-11T23:39:43","date_gmt":"2026-05-11T23:39:43","guid":{"rendered":"http:\/\/65.21.7.236\/s3da-design\/portfolio\/mep-design-for-maryland-aba-therapy-center-hagerstown-md\/"},"modified":"2026-05-11T23:39:43","modified_gmt":"2026-05-11T23:39:43","slug":"mep-design-for-maryland-aba-therapy-center-hagerstown-md","status":"publish","type":"portfolio","link":"http:\/\/65.21.7.236\/s3da-design\/portfolio\/mep-design-for-maryland-aba-therapy-center-hagerstown-md\/","title":{"rendered":"MEP Design for Maryland ABA Therapy Center,\u00a0Hagerstown, MD\u00a0"},"content":{"rendered":"\n<p>S3DA Design&nbsp;is providing&nbsp;HVAC and Electrical engineering design services for a 6,905-square-foot Level 1 alteration project&nbsp;located&nbsp;in Hagerstown, Maryland. The facility is being renovated to support Applied Behavior Analysis (ABA) therapy services for individuals with autism, requiring a comfortable, safe, and energy-efficient indoor environment tailored to healthcare and educational use.&nbsp;<\/p>\n\n\n\n<p>With a fast-track schedule targeting a Construction Document (CD) set delivery in the first week of June 2026, S3DA\u2019s coordinated engineering approach focuses on efficient system redistribution, code compliance, and seamless integration within the existing building infrastructure.&nbsp;&nbsp;<\/p>\n\n\n\n<p><strong>S3DA\u2019s Scope of Services<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>Electrical Design<\/strong>&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Evaluation and coordination of existing incoming electrical service and distribution systems\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Design of power distribution systems, including panelboards and branch circuits\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>New interior lighting, exit signs, and lighting controls\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Electrical\u00a0rough-ins\u00a0for new outlets and room layouts\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Power distribution for HVAC equipment and miscellaneous systems\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Low-voltage rough-in coordination per owner requirements\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong>HVAC Design<\/strong>&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>HVAC system redesign and redistribution for new therapy room configurations\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Mechanical load calculations and air balancing\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>New air distribution devices and duct layout coordination\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Exhaust ventilation design for restroom areas\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Mechanical schedules and HVAC distribution plans\u00a0\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong>Key Challenges &amp; Solutions<\/strong>&nbsp;<\/p>\n\n\n\n<p>One of the primary project challenges is redesigning HVAC and electrical systems without access to existing MEP drawings. S3DA\u2019s engineering team will perform detailed field verification and develop coordinated permit-ready documents that align with the new therapy-focused floor plan while maximizing reuse of existing infrastructure wherever&nbsp;feasible.&nbsp;<\/p>\n\n\n\n<p>By strategically redistributing existing systems and integrating new HVAC air distribution layouts, S3DA helps&nbsp;optimize&nbsp;occupant comfort, indoor air quality, and operational efficiency for therapy spaces that require consistent environmental control and reliability.&nbsp;<\/p>\n\n\n\n<p><strong>The Result<\/strong>&nbsp;<\/p>\n\n\n\n<p>S3DA will deliver a coordinated HVAC and Electrical permit set designed to support the successful transformation of the facility into a functional ABA therapy center. Through integrated engineering coordination, efficient system planning, and code-compliant design documentation, the project team can move confidently toward permitting and construction while&nbsp;maintaining&nbsp;schedule and budget goals.&nbsp;<\/p>\n","protected":false},"featured_media":5020,"template":"","projectscategories":[461],"class_list":["post-9372","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","projectscategories-medicalhealthcare-facilities"],"acf":[],"_links":{"self":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/portfolio\/9372","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/types\/portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media\/5020"}],"wp:attachment":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media?parent=9372"}],"wp:term":[{"taxonomy":"projectscategories","embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/projectscategories?post=9372"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}