
{"id":9333,"date":"2026-02-17T00:13:53","date_gmt":"2026-02-17T00:13:53","guid":{"rendered":"http:\/\/65.21.7.236\/s3da-design\/portfolio\/structural-mepf-engineering-for-the-masters-university-centennial-campus-santa-clarita-ca\/"},"modified":"2026-02-17T00:13:53","modified_gmt":"2026-02-17T00:13:53","slug":"structural-mepf-engineering-for-the-masters-university-centennial-campus-santa-clarita-ca","status":"publish","type":"portfolio","link":"http:\/\/65.21.7.236\/s3da-design\/portfolio\/structural-mepf-engineering-for-the-masters-university-centennial-campus-santa-clarita-ca\/","title":{"rendered":"Structural &amp; MEPF Engineering\u00a0for\u00a0The Master\u2019s University \u2013 Centennial Campus,\u00a0Santa Clarita, CA\u00a0"},"content":{"rendered":"\n<p><strong>Total Area: 112,293 ft\u00b2<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>S3DA Design is providing full Structural and MEPF (Mechanical, Electrical, Plumbing, and Fire Protection) engineering services for the Centennial Campus expansion at The Master\u2019s University. This multi-building academic development enhances science education, mathematics, athletics, worship facilities, and campus life. The project is currently in Design Development (DD) following completion of Schematic Design (SD).<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>Campus Buildings<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>Building A \u2013 Biological &amp; Physical Science (20,556 ft\u00b2)<\/strong>&nbsp;<br><strong>Academic science building with laboratories, instructional classrooms, and faculty support areas.<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>Building B \u2013 Math &amp; Kinesiology (13,041 ft\u00b2)<\/strong>&nbsp;<br><strong>Academic and movement science facility with classrooms, offices, and collaboration spaces.<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>Building C \u2013 Chapel (40,612 ft\u00b2)<\/strong>&nbsp;<br><strong>High-occupancy worship and assembly building designed for large gatherings and campus events.<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>Building D \u2013 Practice Gym &amp; Cafeteria (33,442 ft\u00b2)<\/strong>&nbsp;<br><strong>Athletic training facility and dining space supporting student life and recreation.<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>Building E \u2013 Welcome Center (4,642 ft\u00b2)<\/strong>&nbsp;<br><strong>Administrative and admissions facility serving as the campus entry and reception hub.<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>MEPF Works<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>S3DA delivered fully coordinated mechanical, electrical, plumbing, and fire protection systems across all buildings:<\/strong>&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>HVAC systems with detailed heat load analysis and duct layout<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Electrical power distribution, lighting layouts, panel schedules, and SLDs<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Domestic water, sanitary, stormwater, and gas systems with riser diagrams<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Fire sprinkler layouts with hydraulic calculations<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Full interdisciplinary coordination to ensure constructability and code compliance<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong>Structural Works<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>S3DA provided comprehensive structural engineering services including:<\/strong>&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Gravity and lateral load analysis<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Seismic design in compliance with California building codes<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Foundation system design<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Structural framing systems for classrooms, labs, gymnasium, and large-span chapel spaces<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Structural support for mechanical equipment and service integration<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Complete calculation packages and construction documentation<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong>Design Challenges<\/strong>&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Limited ceiling plenum space in academic buildings restricting HVAC routing<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Large mechanical system demands in the Chapel due to high occupancy and mixed-height spaces<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Dense coordination of MEP systems in laboratory environments<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Integration of large athletic and assembly spaces requiring long structural spans<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Maintaining architectural aesthetics while routing major services<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong>S3DA Solutions<\/strong>&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Strategic placement of HVAC units in corridors and basement areas<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Routing ductwork between structural framing members to minimize conflicts<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Use of thin-profile ducting and exterior routing where necessary<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Early structural-MEP coordination to optimize ceiling and equipment space<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Long-span structural systems to support assembly and athletic functions<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Efficient foundation and lateral systems designed for campus-wide consistency<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong>Key Design Features<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong>MEP Key Features<\/strong>&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Optimized HVAC zoning for academic, laboratory, athletic, and assembly uses<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>High-capacity ventilation for large occupancy spaces<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Coordinated service routing within constrained ceiling spaces<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Energy-efficient system design aligned with code requirements<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<p><strong>Structural Key Features<\/strong>&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Seismic-resilient lateral force-resisting systems<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Long-span framing for chapel and gymnasium<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Structural systems accommodating dense MEP integration<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Equipment load support without increasing structural depth<\/strong>\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Efficient load paths and foundation optimization<\/strong>\u00a0<\/li>\n<\/ul>\n","protected":false},"featured_media":4943,"template":"","projectscategories":[457],"class_list":["post-9333","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","projectscategories-daycare-and-school"],"acf":[],"_links":{"self":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/portfolio\/9333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/types\/portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media\/4943"}],"wp:attachment":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media?parent=9333"}],"wp:term":[{"taxonomy":"projectscategories","embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/projectscategories?post=9333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}