
{"id":9322,"date":"2026-01-11T11:55:00","date_gmt":"2026-01-11T11:55:00","guid":{"rendered":"http:\/\/65.21.7.236\/s3da-design\/portfolio\/structural-and-mep-design-for-airport-hangars-ga\/"},"modified":"2026-01-11T11:55:00","modified_gmt":"2026-01-11T11:55:00","slug":"structural-and-mep-design-for-airport-hangars-ga","status":"publish","type":"portfolio","link":"http:\/\/65.21.7.236\/s3da-design\/portfolio\/structural-and-mep-design-for-airport-hangars-ga\/","title":{"rendered":"Structural and MEP design\u00a0for\u00a0airport hangars, Peachtree, GA"},"content":{"rendered":"\n<p>S3DA Design provided comprehensive Structural and MEP engineering services for a new\u00a0aircraft\u00a0hangar facility in Peachtree, Georgia, designed to support aviation operations, maintenance, and future growth.\u00a0<\/p>\n\n\n\n<p>The project features a 120\u2019 \u00d7 120\u2019 Pre-Engineered Metal Building (PEMB) with a 32\u2019 eave height and a total footprint of 14,400 SF, including a 1,000 SF office area engineered to accommodate a future office mezzanine \/ storage deck. The hangar includes a 110\u2019 wide&nbsp;aircraft&nbsp;door, slab-on-grade construction, and a sprinklered Type IIB structure with 3-phase power.&nbsp;<\/p>\n\n\n\n<p>Structural Engineering Scope&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Foundation and slab-on-grade design accounting for wind, seismic, dead, and live loads&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Spread footings, grade beams, slab thickening, and jointing for the PEMB system&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Independent&nbsp;aircraft&nbsp;door foundation design, coordinated with manufacturer reactions&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Anchorage and embed design for columns, frames, and door bays&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Office mezzanine structural design, including gravity and lateral systems, vibration and deflection control, slab checks, and PEMB tie-in strategies&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Complete structural drawings, details, and calculations&nbsp;<\/li>\n<\/ul>\n\n\n\n<p>MEP Engineering Scope&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Electrical: Utility service and distribution, hangar and office lighting, egress and fa\u00e7ade lighting, receptacles, HVAC power, and low-voltage rough-ins&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Mechanical (HVAC): Office HVAC system with load calculations, air distribution, restroom exhaust, warehouse ventilation, and mechanical schedules&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Plumbing: Domestic water, sanitary, venting, water heating, condensate management, equipment schedules, and isometric drawings&nbsp;<\/li>\n<\/ul>\n\n\n\n<p>This project reflects S3DA Design\u2019s&nbsp;expertise&nbsp;in aviation facilities, PEMB structures, and integrated Structural + MEP solutions, delivering a code-compliant, efficient, and scalable hangar design.&nbsp;<\/p>\n","protected":false},"featured_media":4922,"template":"","projectscategories":[454],"class_list":["post-9322","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","projectscategories-industrial"],"acf":[],"_links":{"self":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/portfolio\/9322","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/types\/portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media\/4922"}],"wp:attachment":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media?parent=9322"}],"wp:term":[{"taxonomy":"projectscategories","embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/projectscategories?post=9322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}