
{"id":9263,"date":"2025-09-16T07:47:28","date_gmt":"2025-09-16T07:47:28","guid":{"rendered":"http:\/\/65.21.7.236\/s3da-design\/portfolio\/congregate-living-health-facility-in-inglewood-ca\/"},"modified":"2025-09-16T07:47:28","modified_gmt":"2025-09-16T07:47:28","slug":"congregate-living-health-facility-in-inglewood-ca","status":"publish","type":"portfolio","link":"http:\/\/65.21.7.236\/s3da-design\/portfolio\/congregate-living-health-facility-in-inglewood-ca\/","title":{"rendered":"Congregate Living Health Facility in Inglewood, CA"},"content":{"rendered":"\n<p>The clients&#8217; request was to provide full <a href=\"\/structural-engineering-services-california-us\/\">Structural package<\/a> for a 3-story building ( congregate living health facility ) based on the previous architect&#8217;s designs, and the client\u2019s new expectations.<br>The first challenge that we had to face was to implement an initial congruence of the designed elements, and the pre-estimated loads in coordination with the architect, and the client himself. That led us to grasp a deeper understanding of the clients\u2019 demands since the owner had some problems with some of the designed elements e.g. the number of posts in the basement etc.<br>The next challenge was to run the calculations in three steps each time trying to remove as much as the overdesigned elements, including the columns and apply the most cost-effective yet, structurally feasible and available material.<br>One of our advantages was the BIM solution (Building Information Modeling). We would have spent much more time, if we had started the process in CAD.<br>Project Timeframe: It was initially agreed to accomplish the job during a month from the agreement, but we had to proceed beyond the schedule due to the changes, but we finally were able to accomplish the job perfectly reaching the clients\u2019 satisfaction.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-our-deliverables-per-the-agreement-signed-with-the-client\">Our deliverables per the agreement signed with the client:<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Structural package and calculation report based on the locally available material.<\/li>\n<\/ul>\n\n\n\n<p>Client:<br>Nick Terzyan<\/p>\n\n\n\n<p>Date:<br>November 2018<\/p>\n\n\n\n<p>Location:<br>Hyde Park, Inglewood, CA.<\/p>\n","protected":false},"featured_media":4818,"template":"","projectscategories":[457],"class_list":["post-9263","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","projectscategories-daycare-and-school"],"acf":[],"_links":{"self":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/portfolio\/9263","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/types\/portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media\/4818"}],"wp:attachment":[{"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/media?parent=9263"}],"wp:term":[{"taxonomy":"projectscategories","embeddable":true,"href":"http:\/\/65.21.7.236\/s3da-design\/wp-json\/wp\/v2\/projectscategories?post=9263"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}